ASD Transport
Medway, Kent

Details

ASD Transport is one of the South East’s leading coach and bus companies, operating from a large facility situated in Medway, Kent.

The coach and bus storage area required resurfacing and upgrading.   We worked closely with the Management Team of this multi-generational family run business and agreed that the following works would be required to facilitate the upgrade:   Block Paving, Kerbing, Concrete Works, Tarmac Works, Foul Drainage, Street Furniture, Surface Drainage, Interceptor Installation to EA Specification, Security Fencing, Brick Walls, Associated Metalwork and a 12m Powered Access Gate with associated control package.

The finished project resulted in over 1000m2 of block paved parking area, over 100m2 of wash down area with associated surface drainage and the installation of new foul drainage for new toilet facilities.   The site was also secured with perimeter security fencing and double skinned brick walls.   To the front of the site we installed a new tarmac frontage with no parking bollards and reinforced concrete crossing points for the on-site VOSA testing station.  

At the pre-Construction phase we worked closely with the client to ensure that the correct budget for the scheme was built efficiently and promptly.   We also carried out some design works to allow the client to move forward quickly with the project and were principle contractor for the project.   

Once the design works were complete we mobilised promptly and delivered the project on time and to budget.   The site was kept fully operational during our works and the client was particularly happy with the works.

This project serves as a great example of our collaborative approach to pre-construction and design activities which allow for a prompt start on site.   It highlights our ability to work within the confines of busy operational spaces and yet still retain our approach to quality, health and safety and timescales.

We wish ASD many more years of successful business from this site and look forward to the opportunity of working with them again in the future on further projects.

Project Facts

  • Duration 8 weeks
  • Value £180k
  • Client ASD Transport
  • ASD Transport
  • ASD Transport
  • ASD Transport
  • ASD Transport
  • ASD Transport
  • ASD Transport
  • ASD Transport
  • ASD Transport
  • ASD Transport

Call us today to talk about your project  01227 830198